Firstly the mould was waxed to ensure that the roof would release, once done the gel coat was added, done in black
The gel coat was then left to cure
With the gel coat cured 2layers of 450g chop strand matt was added and then followed with a single layer of tissue
While the gel coat was curing time was spent removing any left over bungs, screws etc, also the vents have been blended in
Work started on the scuttle / a panel to remove the join between the two panels
Due to the car being a 2002 shell the front structure members we welded on to add extra strength
No comments:
Post a Comment